VLMetalworking · Valves

A Valve Manufacturer

Receipts, picking and put-away hand-written then keyed in, tags often wrong — see how going digital made document entry 12× faster.

12×
Receipt entry speedup (4min→20s)
THE STORY

Background & results

01

Even with a commercial ERP in place, the floor still logged assembly counts and production times by hand.

02

Similar part names led to constant mis-picks.

03

Receiving, picking, put-away and sales all had to be hand-written first, then keyed in at a workstation.

SCOPE

MES

Shop-floor execution and named-operator reporting

Material flow

Digital receiving and picking, with pick verification

Labelling

Label printing

THEY NEEDED

See which station every work order has reached

Assembly counts and production times were logged by hand, so a supervisor had to ask around to learn where things stood.

IN THE SYSTEM

Production progress board

Customer order no. / sales order, work order and due date / part name and spec / planned vs received quantity / picking progress (sub-assembly, parts and process, each with its own percentage) / five stations — assembly, tightening & pressure test, handle, inspection, packing — each with a red/green light and a percentage, flagged as photo pending, report pending or reported.

Production progress board

RESULTS

4 min -> 20 s
Receipt entry (about 12x)
20% → 0%
Manual transcription errors
0.5 hr
Fault handling time
TESTIMONIAL

In their words

「A receipt used to take four minutes; now it’s twenty seconds on a PDA — and no more mis-picks.」
VLA Valve ManufacturerPlant Director
MORE CASES

More CTIOT cases

Your factory could be next.

Book a demo — see how ECS fits your shop floor.

Book an Online Live Demo