Failed MES projects outnumber successful ones. But dig in, and the cause is usually not “bad software” — it is “thin preparation.” However good the system, if it cannot connect to your floor and the floor will not use it, it becomes software no one touches. Settling a few things before you start saves a lot of costly detours.

First, map “how floor data is collected.” Do your machines have a communication interface? Who records output today, and how? This decides whether the system can connect and whether you use automatic capture or on-site logging. Second, do not aim for everything at once. Bringing the whole plant live simultaneously has the highest failure rate. Start with the single most painful line — small scope, visible results, and a floor more willing to cooperate.

Third, put “floor buy-in” ahead of the feature list. Many rollouts fail because the system is powerful, but the floor feels “this adds to my work,” so they pay lip service — not entering data or entering it carelessly — and once the data is dirty, the whole thing is dead. Before starting, ask: how do you make the floor feel this helps them, not just adds a step? Fourth, align on “the problem to solve” and a measurable target. Shorten report time? Reduce stock drift? Write the goal as a number so you can tell, after go-live, whether it worked — and it is useful when applying for grants too.

Fifth, accept that adoption is not a one-off. Go-live is just the start; the real value comes after — floor feedback, tuning the flow, gradual expansion. Finding a partner willing to walk with you and who understands the floor matters more than the system with the most features. Settle these five, and MES will not become expensive software bought and shelved. Want to assess what to prepare for your own floor? Book a consultation and we will go through it with you.